- Other Refrigeration & Heat Exchange Equipment[6]
- Plastic Film[1]
- Industrial Metal Detectors[2]
- Paper Product Making Machinery[2]
- Conveyors[1]
- Weighing Scales[1]
- Other Machinery[4]
- Other Metal Processing Machinery[6]
- Lids[6]
- Cans[6]
- Capacitors[6]
- Other Home Product Making Machinery[6]
- Other Graphite Products[2]
- Dish Washers[2]
- Mixing Equipment[3]
- Packaging Tube[2]
- Steel Sheets[1]
- Stainless Steel Sheets[1]
- Valves[4]
- Aluminum Sheets[6]
- Contact Person : Ms. Q Catherine
- Company Name : Shanghai Norchon Packing Tech Co., Ltd.
- Tel : 86-21-62426768
- Fax : 86-21-62426768
- Address : Shanghai,shanghai,No.1730 zhennan Rd,Putuo district Shanghai
- Country/Region : China
- Zip : 200331
Related Product Searches:Fortune Cookies Machinery,High Quality lucky cookies,lucky cookies NZ-480
Automatic lucky cookie making machine
Uses: Automatic Biscuit-Making Machine with Signature (NZ-480) is the production efficiency of cake professional equipment. Sign language is a kind of cake-like "gold ingot" folders within auspicious sign language paper sweet shortbread is a unique feature of Chinese food culture. Sign language generally used in cakes for dessert restaurants, entertainment can also be used as food.
Characteristics:
Description:
The buyer must provide the following utilities:
a) Water: water, electrical conductivity less than 3μs
b) power: 40KW 380V 50HZ
c) Gas: 15kg / h
d) compressed air: P = 8kg / cm 2; compressed air Q = 1.2m3
Project the number of units
Capacity:about 38 kgs / hr.
Whole weight: 6500 Kg
Machine size:L × W × H (mm) 8900 × 2000 × 2150
Related note:
1. All equipment: (machines and components) by the People's Republic of standards, safety regulations to create supply.
2 .All equipment: power supply, voltage 380/220V ± 10% 50HZ, special purpose users, please note in advance.
3. Plant construction manual, the equipment layout technology plans, electrical layout, etc. to be sent after signing a contract to pay.
4. To send the guidance of the production line installation and commissioning engineers to guide the location of installation. For the installation to go abroad for staff travel costs and accommodation at the local, transportation and other costs borne by the demand side.
5. The following is not within the scope of supply
A. plant and construction, design, construction (including the workshop with lighting, water supply, fire fighting system).
B. water, electricity, gas-owned (through production).
C. environmental protection facilities and equipment.
D. debugging packaging materials and bags. E. self-demand-side of (Frederick) post-mortem room and a machine repair workshop.
6. The complete sets of equipment in addition to the actual production equipment conditions, as varieties of raw materials, utilities conditions, skill level involved in the operation to another.
7, the production line for 120 days, testing time is 30 ~ 50 days.