Shanghai Norchon Packing Tech Co., Ltd.
Main products:
Products
Contact Us
  • Contact Person : Ms. Q Catherine
  • Company Name : Shanghai Norchon Packing Tech Co., Ltd.
  • Tel : 86-21-62426768
  • Fax : 86-21-62426768
  • Address : Shanghai,shanghai,No.1730 zhennan Rd,Putuo district Shanghai
  • Country/Region : China
  • Zip : 200331

Lucky Cookies Maker

Lucky Cookies Maker
Product Detailed
We can provide you the best quality machine at reasonable price,of course our service is excellent. Welcome to contact us.

Automatic lucky cookie making machine

Uses: Automatic Biscuit-Making Machine with Signature (NZ-480) is the production efficiency of cake professional equipment. Sign language is a kind of cake-like "gold ingot" folders within auspicious sign language paper sweet shortbread is a unique feature of Chinese food culture. Sign language generally used in cakes for dessert restaurants, entertainment can also be used as food.

Characteristics:

Description:

The buyer must provide the following utilities:

a) Water: water, electrical conductivity less than 3μs

b) power: 40KW 380V 50HZ

c) Gas: 15kg / h

d) compressed air: P = 8kg / cm 2; compressed air Q = 1.2m3

Project the number of units

Capacity:about 38 kgs / hr.

Whole weight: 6500 Kg

Machine size:L × W × H (mm) 8900 × 2000 × 2150

 

Related note:

1. All equipment: (machines and components) by the People's Republic of standards, safety regulations to create supply.

2 .All equipment: power supply, voltage 380/220V ± 10% 50HZ, special purpose users, please note in advance.

3. Plant construction manual, the equipment layout technology plans, electrical layout, etc. to be sent after signing a contract to pay.

4. To send the guidance of the production line installation and commissioning engineers to guide the location of installation. For the installation to go abroad for staff travel costs and accommodation at the local, transportation and other costs borne by the demand side.

5. The following is not within the scope of supply

A. plant and construction, design, construction (including the workshop with lighting, water supply, fire fighting system).

B. water, electricity, gas-owned (through production).

C. environmental protection facilities and equipment.

D. debugging packaging materials and bags. E. self-demand-side of (Frederick) post-mortem room and a machine repair workshop.

6. The complete sets of equipment in addition to the actual production equipment conditions, as varieties of raw materials, utilities conditions, skill level involved in the operation to another.

7, the production line for 120 days, testing time is 30 ~ 50 days.



Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.